Panattoni
Construction of a district heat network and district heating connections with a length of about 1.5 km to 4 storage halls and the installation of four triple-function exchangers.
Poland
Ladies and Gentlemen, from May 25, 2018, the Regulation of the European Parliament and of the Council of the European Union 2016/679 of April 27, 2016 (GDPR) has been in force. We need your consent to the processing of your personal data, including those stored in cookies.
Ladies and Gentlemen, from May 25, 2018, the Regulation of the European Parliament and of the Council of the European Union 2016/679 of April 27, 2016 (GDPR) has been in force. We need your consent to the processing of your personal data, including those stored in cookies. Below is the full range of information on this topic.
By clicking the 'Allow all' button, you consent to the use of your data. I agree to the storage of the so-called cookies and for the processing of my personal data left when I use products and services provided electronically as part of websites, services and other functionalities, including information and other parameters saved in cookies for analytical purposes by Dalkia Polska Sp. z o. o., entities of the Dalkia capital group and business partners of the Dalkia group.
Purposes of data processing 1. providing services electronically 2. adapting the content of websites to preferences and interests 3. detecting bots and abuses in services 4. statistical measurements and improving services (analytical purposes) Legal basis for data processing 1. analytical purposes - consent 2. provision of services by electronic means - necessity of data to provide the service 3. other purposes - legitimate interest of the data controller Data recipients Entities processing data on behalf of the data controller, including entities of the Dalkia capital group and business partners of the Dakia Polska group and entities authorized to obtain data on the basis of applicable law laws. Rights of the data subject The right to request rectification, deletion or limitation of data processing; the right to withdraw consent to the processing of personal data.
We also inform you that by using this Website without changing the settings of the software/browser used, you consent to the storage of cookies and similar technologies on your end device and the use of the information stored in them. * Profiling will use at least: the following data: your IP address, request URL, domain name, device identifier, and other similar information.
A well-thought-out structure, limiting the amount of content and materials embedded in the site and moving the site to an energy-efficient eco-server are the keys to reducing CO2 emissions.
We have reduced the number of websites of our companies from 3 to 1.
Thanks to the use of bichromy (limiting the number of colors to two), and thus abandoning the use of white color, the photos on the site have little weight therefore monitors use less energy to display them. The site is much "lighter" and more environmentally friendly.
We have reduced the number of images, videos and files embedded on the page. We've also compressed each element to take up as little space as possible
Construction of a district heat network and district heating connections with a length of about 1.5 km to 4 storage halls and the installation of four triple-function exchangers.
Poland
Dalkia was entrusted with the task of constructing a heat network and heating connections with a length of approx. 1.5 km to 4 warehouse halls and building four triple-function heat exchangers.
The project required numerous consultations with the technical infrastructure and transport managers, including the city of Katowice and the Polish State Railways (PKP), as it required the crossing of 2 railroad tracks.
It was crucial for the Client to enter the project implementation phase as soon as possible. The challenge was to obtain all necessary construction permits in record time.
In just 6 months, Dalkia Polska Energia received all necessary approvals and started to develop a construction design for the heat network and heat connections with a total length of over 1.4 km. We have also made a technical design of four three-functional district heating substations. After arranging formal issues and obtaining necessary permits, Dalkia also performed 2*105 m long steered drilling under the railway track. Coordinated all investment works on the constructi.
more than
total length of the heat network and heating connections
length of steerable drilling under the track
monitoring of the nodes operation
Multi-technical and multi-service maintenance
Heat recovery from the air-cooling tower via a high temperature heat pump for hot water preparation.
France
Operation and maintenance of steam boilers and compressed air and cooling equipment.
France
A “turnkey” solution to optimise media production for a glass manufacturing plant.
France
Send a message to ekspert@dalkia.com