OI MANUFACTURING – Béziers
A “turnkey” solution to optimise media production for a glass manufacturing plant.
France
Ladies and Gentlemen, from May 25, 2018, the Regulation of the European Parliament and of the Council of the European Union 2016/679 of April 27, 2016 (GDPR) has been in force. We need your consent to the processing of your personal data, including those stored in cookies.
Ladies and Gentlemen, from May 25, 2018, the Regulation of the European Parliament and of the Council of the European Union 2016/679 of April 27, 2016 (GDPR) has been in force. We need your consent to the processing of your personal data, including those stored in cookies. Below is the full range of information on this topic.
By clicking the 'Allow all' button, you consent to the use of your data. I agree to the storage of the so-called cookies and for the processing of my personal data left when I use products and services provided electronically as part of websites, services and other functionalities, including information and other parameters saved in cookies for analytical purposes by Dalkia Polska Sp. z o. o., entities of the Dalkia capital group and business partners of the Dalkia group.
Purposes of data processing 1. providing services electronically 2. adapting the content of websites to preferences and interests 3. detecting bots and abuses in services 4. statistical measurements and improving services (analytical purposes) Legal basis for data processing 1. analytical purposes - consent 2. provision of services by electronic means - necessity of data to provide the service 3. other purposes - legitimate interest of the data controller Data recipients Entities processing data on behalf of the data controller, including entities of the Dalkia capital group and business partners of the Dakia Polska group and entities authorized to obtain data on the basis of applicable law laws. Rights of the data subject The right to request rectification, deletion or limitation of data processing; the right to withdraw consent to the processing of personal data.
We also inform you that by using this Website without changing the settings of the software/browser used, you consent to the storage of cookies and similar technologies on your end device and the use of the information stored in them. * Profiling will use at least: the following data: your IP address, request URL, domain name, device identifier, and other similar information.
A well-thought-out structure, limiting the amount of content and materials embedded in the site and moving the site to an energy-efficient eco-server are the keys to reducing CO2 emissions.
We have reduced the number of websites of our companies from 3 to 1.
Thanks to the use of bichromy (limiting the number of colors to two), and thus abandoning the use of white color, the photos on the site have little weight therefore monitors use less energy to display them. The site is much "lighter" and more environmentally friendly.
We have reduced the number of images, videos and files embedded on the page. We've also compressed each element to take up as little space as possible
A “turnkey” solution to optimise media production for a glass manufacturing plant.
France
Built in 2000, the OI Manufacturing site in Béziers is one of the largest and most modern glass bottle production facilities in the south of France.
Its furnace capacity is 500 tonnes of molten glass per day. A “turnkey” solution including design, installation, and operation along with financing is required to optimise media production and guarantee 24/7 service continuity.
A 10-year commitment has been made by Dalkia to provide the plant with 4b hot compressed air, 7b cold air, vacuum, cooling and WCT, water treatment, HV electricity and steam with adherence to operating parameters.
As such, Dalkia is undertaking technical and energy engineering works, including the provision of a feed station, designed in phase with the load curve and back-up equipment. To ensure safe and efficient operation and to significantly reduce the storage of hazardous chemical products, Dalkia recommended and designed an in-situ electrolyser. Implemented global equipment surveillance, with redundancy and a temporary predictive maintenance process with thermographic analysis, vibration analysis, water, oil analysis, etc. Dalkia ensured the resilience of the plant for liquids for short breaks and production flexibility in line with the customer's load curve.
Tasked of Dalkia consisted of managing the constructors and fitters for the construction of the power plant, replacing cascade modules of generators and compressors but also was responsible for the financial assembly of the investment (Dalkia provided full financing for the power plant).
of installed compressed air
savings in electricity consumption
A partnership that has lasted
Multi-technical and multi-service maintenance
Heat recovery from the air-cooling tower via a high temperature heat pump for hot water preparation.
France
Operation and maintenance of steam boilers and compressed air and cooling equipment.
France
Design, build and finance a 2.6 MWe cogeneration unit.
France